We offer some of the most experienced Intelligent Transport Systems (ITS), smart lighting, and traffic signal designers in the industry, with skills in areas such as cooperative ITS (C-ITS), tolling and enforcement systems. Our team has contributed to delivering major arterial, motorway and tunnel design projects including the West Gate Tunnel ITS, Exit 45 ITS, WestConnex ITS, the Toowoomba Second Range Crossing ITS, lighting and signals and the Qatar Expressways Program ITS, which included arterial, viaduct, smart motorway and tunnel ITS design and systems engineering.
For smart lighting, we provided engineering management services for the 30,000 luminaire Smart LED Road Lighting project rollout across Queensland for TMR, as well as delivering large scale road lighting designs in the Northern Territory, and tunnel lighting upgrades in Queensland and NSW.
Our design approach integrates systems engineering best practice with practical delivery experience. These are supported by a rigorous internal review process to ensure designs meet operational, cost and maintenance requirements.
-

Camera Detected Offence Program – P2P & CRLSC Specification Development
A comprehensive suite of technical specifications and standard layouts that aligned CDOP requirements with MRTS frameworks, providing a consistent and up-to-date reference for design and construction activities statewide.
-

Stuart Highway, Bagot Rd, McMillans Rd and Tivendale Rd Street Lighting Upgrade Design/Procurement Documentation
A comprehensive design framework enabling DLI to transition from legacy HPS lighting to smart LED technology across key Darwin corridors, delivering measurable reductions in power consumption and streamlined maintenance workflows while improving road safety outcomes.
-

Camera Detected Offence Program – Engineering Management, Business Cases and Proofs of Concept
Delivery of comprehensive design and construction management support for CDOP programs across the Metropolitan and South Coast Region, ensuring compliance with MRTS standards and maintaining effective stakeholder coordination throughout the project lifecycle.
-

Next Generation Traffic Signalling Program – CFMS and Training Materials Update
Successfully established a clear path to finalise the CFMS by defining a verified scope of work and recommended transitioning to an in-house resource strategy to avoid further vendor costs. Delivered comprehensive specifications, test frameworks, and revised folder structures, ensuring the system met required workflows while securing the knowledge base needed for program continuation.
-

Leura Tunnel Smart LED Lighting and Control System Upgrade
Completed comprehensive LED lighting detailed design for the Leura Tunnel Upgrade, achieving full regulatory compliance and establishing documentation ready for as-built completion while supporting extended service life and reduced maintenance requirements.
-

Pacific Motorway (M1) Exit 45 – ITS Design & Implementation
Successful delivery of a fully integrated ITS solution at Exit 45, providing enhanced monitoring capabilities via CCTV, Bluetooth, and radar technologies while ensuring robust connectivity to the broader motorway control systems and power networks.
